{"id":9795,"date":"2023-07-27T13:19:14","date_gmt":"2023-07-27T13:19:14","guid":{"rendered":"https:\/\/www.sominnport.cat\/?p=9795"},"modified":"2023-07-27T13:20:55","modified_gmt":"2023-07-27T13:20:55","slug":"smartbridge-hamburg-innovation-in-kohlbrand-bridge-management","status":"publish","type":"cas","link":"https:\/\/sominnport.cat\/en\/observatori\/smartbridge-hamburg-innovation-in-kohlbrand-bridge-management\/","title":{"rendered":"SmartBRIDGE Hamburg: Innovation in K\u00f6hlbrand Bridge Management"},"content":{"rendered":"<h4><b><span data-contrast=\"none\">Project leader<\/span><\/b><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/h4>\n<p><span data-contrast=\"none\">The project manager is the <a href=\"https:\/\/www.hafen-hamburg.de\/en\/homepage\/\">Hamburg Port Authority (HPA)<\/a>.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<h4><b><span data-contrast=\"none\">Description of the project<\/span><\/b><span data-contrast=\"none\">\u202f<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/h4>\n<p><span data-contrast=\"none\">The K\u00f6hlbrand Bridge is a Hamburg landmark and the backbone of industry and transport in the port. The bridge is half a century old, has a length of 3.6 kilometers and a capacity of 38,000 vehicles per day. It therefore requires a high level of maintenance.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"none\">A bridge is subject to constant static and dynamic loads. It is therefore subjected to a thorough inspection every three years to detect and eliminate damage.\u00a0<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"none\">The challenge is to perform predictive maintenance and condition analysis at any time.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"none\">The project consists of creating a &#8220;digital twin&#8221; of the K\u00f6hlbrand bridge that combines analog and digital data to provide a complete and detailed view of the structure. This digital twin enables permanent and continuous monitoring of the bridge&#8217;s condition, facilitating more accurate damage prevention and providing a much more predictive, sustainable and proactive maintenance approach.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"none\">The project uses technologies such as Building Information Modeling (BIM), virtual reality and Internet of Things (IoT), along with a suite of sensors and monitoring systems, to collect and contextualize real-time data on the condition of the bridge. This improves collaboration between the different actors involved in the maintenance of the bridge and enables an intuitive 3D interface for better visualization and understanding of the structure.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<h4><b><span data-contrast=\"none\">Objectives of the project<\/span><\/b><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/h4>\n<p><span data-contrast=\"none\">\u202fThe SmartBRIDGE Hamburg project aims at real-time analysis of the condition of the K\u00f6hlbrand Bridge in the Port of Hamburg, to achieve more effective management and predictive maintenance through digital transformation and innovative approaches to bridge maintenance.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"none\">By implementing this new maintenance system, the aim is to optimize resources and ensure timely and proper maintenance, since, thanks to the advanced technologies used, more informed decisions can be made and bridge downtime can be reduced.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<h4><b><span data-contrast=\"none\">Project Information Links<\/span><\/b><span data-contrast=\"none\">\u202f<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/h4>\n<ul>\n<li data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"3\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559684&quot;:-2,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" aria-setsize=\"-1\" data-aria-posinset=\"1\" data-aria-level=\"1\"><a href=\"https:\/\/www.hafen-hamburg.de\/en\/port-of-hamburg-magazine\/the-digital-transformation\/auf-dass-die-vitalwerte-stimmen\/\"><span data-contrast=\"none\">News on the Port of Hamburg website<\/span><\/a><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/li>\n<li data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"3\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559684&quot;:-2,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" aria-setsize=\"-1\" data-aria-posinset=\"2\" data-aria-level=\"1\"><a href=\"https:\/\/www.homeport.hamburg\/portfolio\/smartbridge\"><span data-contrast=\"none\">News in the homePORT innovation portfolio<\/span><\/a><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/li>\n<li data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"3\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559684&quot;:-2,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" aria-setsize=\"-1\" data-aria-posinset=\"2\" data-aria-level=\"1\"><a href=\"https:\/\/future.hamburg\/en\/artikel\/smartbridge-hamburg-communicative-bridge-tomorrow\"><span data-contrast=\"none\">News in Future Hamburg<\/span><\/a><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/li>\n<\/ul>\n<h4><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><b><span data-contrast=\"none\">News release date<\/span><\/b><span data-contrast=\"none\">\u202f\u202f<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/h4>\n<p>27th July 2023<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Project leader\u00a0 The project manager is the Hamburg Port Authority (HPA).\u00a0 Description of the project\u202f\u00a0 The K\u00f6hlbrand Bridge is a Hamburg landmark and the backbone of industry and transport in the port. The bridge is half a century old, has a length of 3.6 kilometers and a capacity of 38,000 vehicles per day. It therefore [&hellip;]<\/p>\n","protected":false},"featured_media":9787,"template":"","ambit":[],"origen":[1189],"etiqueta":[1224],"class_list":["post-9795","cas","type-cas","status-publish","has-post-thumbnail","hentry","origen-extern","etiqueta-logistics-chain"],"_links":{"self":[{"href":"https:\/\/sominnport.cat\/en\/wp-json\/wp\/v2\/cas\/9795","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sominnport.cat\/en\/wp-json\/wp\/v2\/cas"}],"about":[{"href":"https:\/\/sominnport.cat\/en\/wp-json\/wp\/v2\/types\/cas"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sominnport.cat\/en\/wp-json\/wp\/v2\/media\/9787"}],"wp:attachment":[{"href":"https:\/\/sominnport.cat\/en\/wp-json\/wp\/v2\/media?parent=9795"}],"wp:term":[{"taxonomy":"ambit","embeddable":true,"href":"https:\/\/sominnport.cat\/en\/wp-json\/wp\/v2\/ambit?post=9795"},{"taxonomy":"origen","embeddable":true,"href":"https:\/\/sominnport.cat\/en\/wp-json\/wp\/v2\/origen?post=9795"},{"taxonomy":"etiqueta","embeddable":true,"href":"https:\/\/sominnport.cat\/en\/wp-json\/wp\/v2\/etiqueta?post=9795"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}